Every floor we install is diamond-ground and gets a 100% solids epoxy moisture vapor barrier before the flake goes down. That is the difference between a floor that bonds into the concrete and a coating rolled onto a cleaned slab, and it is why every floor carries a lifetime warranty against peeling and lifting. The 1,300 sq ft pool deck on this page got the same prep, with its cracks repaired as part of the job.
Most floors are done in one day. You walk on it and bring things back the next day, and park on it after 48 hours. You get the full price in writing before any work starts, and if a basement slab feels damp, Julio looks at it in person before we quote. Pool decks and patios stay cool in the sun and grip wet feet.
Julio Villalobos has been coating floors since 2009, and JC Epoxy Flooring has 5.0 stars on Google. We're based in Bridgewater, west on Route 22.